2 869 855 libros electrónicos en 110 idiomas
¿No le conviene? No hay problema. Puedes devolver los artículos hasta 30 días
No se equivocará con un vale de regalo. El destinatario puede elegir cualquier producto de nuestra oferta.
Hasta 30 días para devoluciones
Practical Construction Planning and Control Using Microsoft Project fills a clear gap in the teaching literature by specifically demonstrating the Critical Path Method (CPM) using Microsoft Project (MSP).
This new textbook provides a brief description of CPM phases and explains and illustrates the particular MSP commands and functionalities that implement them using an example construction project which is consistent throughout every chapter of the book. Each CPM phase is explained along with the relevant MSP commands coupled with explanations and illustrations that describe the implementation. The chapters provide detailed descriptions and steps for the generation of common construction scheduling deliverables, such as Gantt chart schedules and cash flow reports.
Following an Introduction that lays out the essential concepts, the thirteen chapters cover planning, scheduling, resources and costs, project updating for time and cost, project progress measurement using earned value analysis and project reports.
By successfully combining the details of CPM as a management technique with illustrated guidance on the software, the book presents a hands-on self-study guide for learning CPM and MSP and is an ideal teaching tool for use on Construction Management, Construction Engineering and Project Management degree programs and for Professionals who are looking to learn construction project scheduling using widely available Microsoft Project software.
¡Hola! Soy Libroamiko, tu asesor de libros.
¿Cómo puedo ayudarte?